Installation Overview Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. This initiative reflects a substantial step forward in the client’s ESG framework, enhancing operational resilience and ensuring measurable decreases in both power usage and carbon output. https://explorebookmarks.com/story20626499/high-efficiency-400-kw-chiller-installation-achieves-50k-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving