He additional that Section two would include the stretch within the Lekki next toll gate into the Ajah underneath-bridge and could well be divided into 4 sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane even though repairs are ongoing on another lane,” Osiyemi stated. https://adolfd318wbd0.wikiinside.com/user