Ken Mattingly was moved from the assist crew into parallel education with Anders as backup CMP in case Apollo 11 was delayed earlier its intended July start day, at which stage Anders might be unavailable.[59] Upon arrival in the Vertical Assembly Creating, each stage was inspected within a horizontal https://wearables32002.bloggerswise.com/41742409/5-simple-techniques-for-apollo3