The plans also include things like a huge battery at the internet site, to guarantee excess electric power can be stored for that night, in addition to a 220 kV transmission line which will connect the project into the North Star sub-station, close to in which a different one hundred https://totalsolar.com.au/5kw-solar-system-will-it-run-a-house/